Loading...
Logo
Backend Node.js Non-Aktif

Sistem Dalam Pemeliharaan

Aplikasi saat ini tidak dapat terhubung ke server backend (Node.js). Server sedang dihentikan atau dalam pemeliharaan rutin. Halaman akan aktif kembali secara otomatis begitu server dinyalakan.

Logo

EMP

Engineering Management Portal

Forgot Password?

Enter your email and we'll generate a password reset link for you.

Back to Login

Enter your new password below.

powered by penta technology
Logo EMP
- -
100
Asset
🔄
Pull down to refresh...
💰 Total Revenue IDR 0
🛏️ Rooms Sold 0
💸 Cost / Room Sold IDR 0
⚡

Electricity Cost

Total (WBP + LWBP cost) + 9% tax

IDR 0
Cost of Revenue Percentage 0.00%
💧

PDAM Cost

Total water consumption

IDR 0
Cost of Revenue Percentage 0.00%

Fuel Cost

Total genset fuel consumption

IDR 0
Cost of Revenue Percentage 0.00%
🔥

CNG Cost

Total kitchen gas usage

IDR 0
Cost of Revenue Percentage 0.00%
Daily Operations Checklists
Date & Time Submitted By Shift LWBP WBP PDAM Gas Genset Mode LWBP Cost WBP Cost PDAM Cost Gas Cost Ground Tank Roof Tank Accu (V) Solar (L) MATV CCTV Actions
Loading checklists...
Generator Logbook
Date & Time User ID Start Stop Total Running Accu (V) Temp (°C) RPM Load (KW) Fuel Consumed (L) Total Fuel (L) Running Hours Amp R Amp S Amp T Remark Actions
Loading generator logs...
APAR Checklist Logs
Date & Time Checked By Location Condition Exp Date Pressure Photo Remark Actions
Loading APAR logs...
Hydrant Checklist Logs
Date & Time Checked By Location Hose Nozzle Bel Condition Photo Remark Actions
Loading Hydrant logs...
Maintenance Schedules
Date Task Name Status Assigned To / Vendor Category Notes Actions
Loading schedules...
Inventory Transaction History
Date & Time Item Name Category Action Qty User ID Remark
Loading transactions...

Project Planning

📋
Total Projects
0
⏳
In Progress
0
✅
Completed
0
💰
Total Estimated Cost
Rp 0
Project Planning Records
Project Name Task / Scope Schedule Date Deadline Est. Cost Progress Status Remark Actions
Loading projects...

Logbook

Date & Time PIC Task Status Before After Actions
Loading logbook entries...

Room Checklist

Loading room checklist...

Admin Dashboard

Select a menu card below to manage users, configure cost settings, or adjust page access.

Accounts

User Management

Manage user accounts, add new users, change passwords, and manage permissions.

Open User Management
Utilities

Cost Setting

Configure utility pricing parameters including CT Multiplier, LWBP, WBP, PDAM, Gas, and Solar fuel rates.

Open Cost Setting
Access Control

Page Setting

Choose which application pages are active and accessible by user accounts.

Open Page Setting
Rooms

Room & Item Settings

Configure room number range & exclude generator, and manage room checklist master items.

Open Room Config
⭐
Credit System

Credit Score Setting

Enable/disable credit score system, manage user scores (+/- point, reset), and view history logs.

Open Credit Score Setting

User Management

User Accounts
Username Email Role Created At Actions
Loading users...

Cost Setting

Utility Price Configurations

Page Setting

Page Availability Control

Toggle which pages are active and accessible by users in the system. Disabling a page removes it from non-admin users' navigation.

📊
Dashboard

Main metrics overview and costs breakdown

📋
Daily Checklist

Daily engineering operational checklists

📦
Inventory

Engineering stock management and logs

⚡
Genset Checklist

Generator running logs and fuel tracking

🧯
APAR Checklist

Fire extinguisher inspections and status

🚒
Hydrant Checklist

Fire hydrant inspections and condition logs

📅
Maintenance Schedule

Scheduled preventive maintenance tasks

📋
Project Planning

Engineering projects, schedules, costs, and before/after photos

📖
Logbook

Logbook reports, task tracking, and photo documentation

🔑
Room Checklist

Room inspection mini cards, item checklist, and room range configuration

📦
Asset

Physical asset tracking and management

⭐ Credit Score Management

Credit Score Feature:

User Credit Scores (Max: 100)

Account Email Role Current Score Actions
Loading credit scores...

📜 Score Change History Logs

Track shift scoring (+1 on-time, -3/hr late) and manual admin score adjustments with remarks.

Date & Time Account Change Score (Prev → New) Type Remark / Notes
Loading history logs...

New Daily Operations Checklist

×
General Info
Electrical Systems
Utilities & Piping
Hot Water & Plant Systems
Security & Media Systems

Input Daily Room Revenue

×

New Generator Log Entry

×
Schedule & Runtime
Fuel & Accu Parameters
Engine State
Amperage Load (Phases)
Additional Remarks

📅 Filter Period

🖨️ Export PDF Report

Genset Log Detail

Add New User

Change Password

Change User Password

New APAR Checklist

×
APAR Details
Inspector Info
Auto-filled with your username
Documentation

No photo taken yet

Photo captured successfully
Foto hanya bisa diambil dari kamera secara langsung

New Hydrant Checklist

×
Hydrant Details
Inspector Info
Auto-filled with your username
Documentation

No photo taken yet

Photo captured successfully
Foto hanya bisa diambil dari kamera secara langsung

Add Maintenance Schedule

×

⚙️ Update Status Maintenance

×
Informasi Pemeliharaan
-
-
Jadwal: - Kategori: -
✨ Mengubah status akan otomatis meng-update kondisi aset & mencatat log aset.

✅ Selesaikan & Upload Foto Bukti

×
Tugas / Aset:
-

Preview Import Maintenance Schedule

×

We found the following schedules in your file. Please verify them before importing.

Date Task Name Status Assigned To Category Notes
0 rows found

Add New Inventory Item

×

No photo captured

Photo loaded successfully

Stock Transaction

×
Item: -
Current Stock: -

Add New Project

×

Project Detail

×
Schedule Date: -
Deadline: -
Total Estimated Cost: -
PIC Vendor / ENG: -
Task / Scope of Work:
-
Remark / Notes:
-

📈 S-Curve Progress Analysis (Kurva S)

Calculating S-Curve...
🔹 Planned S-Curve (Sigmoidal 0% -> 100%) 🟢 Actual Progress (Report Logs)

📦 Items & Materials Detail

No items attached to this project.

📋 Progress Reports History

No progress reports submitted yet.

Project Reports

-
×

Progress Reports History

Loading reports...

Submit Project Report

×

Photo Preview

×

Add Logbook Report

Photo Before Saat Ini:
Photo After Saat Ini:

Detail Logbook Report

Date & Time: -
PIC (Person In Charge): -
Status: -
Task Description:
-
Item Inventory Digunakan:
📦 Tidak Ada Item
Photo Documentation (Click photo to enlarge):
📷 Photo Before
No Photo
📷 Photo After
No Photo

Room Checklist Inspection

Room Number:

Room -

PIC (Auto Detected):
-
Room Inspection Items

⚙️ Room & Item Settings

Generate Room Numbers (Range & Exclude)

Enter room number range and numbers to exclude. The system will automatically generate room numbers.

Format: 101-120 or comma separated
Skipped room numbers (comma separated)
Active Room List (0 rooms):

Manage Room Checklist Item Names

Add or remove inspection items to be checked for each room.

Clear All Room Checklist Logs

Delete all room inspection history and checklists to reset all room statuses back to ⚪ Unchecked. Room numbers and master items will not be deleted.

⭐ Adjust User Credit Score

×